Month | Location | Project Description |
January | Statham, RCCCE | Renovate room into computer lab and fabricate and install computer bench |
MBA Statham | Fabricate overhead cupboard, replace rugs, and provide design |
Swimming Pool | Renovation to the office |
6th Hall and 7th Hall | Construct cordless mast |
Catalina flats | General Painting Work |
Catalina flats | General Carpentry Work |
Catalina flats | General Plumbing Work |
8th Hall | General electrical works |
8th Hall | General carpentry works |
8th Hall | General plumbing works |
MQ39 | Variation |
2nd Hall, MQ | General carpentry works |
2nd Hall, MQ | General Painting Work |
Statham, RCCCE | Renovate room into computer lab and fabricate and install computer bench |
February | 9th Hall, MQ | Upgrading Works |
9th Hall MQ | General plumbing work |
Dining Hall ( outside) | Varnish outside furniture’s( Vaivai) |
2nd Hall, F/block | Check and fix defect plumbing work |
March | 8th Hall | |
|
Carpentry and painting works for exterior |
4th Hall | Carpentry and painting works on roof |
7th Hall | Carpentry and painting works on roof(upgrading) |
International Students Office | Electrical Work |
FAL, Rooms 105/109 | Install shelves in Rm105. Remove shelves from Rm109 |
FAL, Room 109 | Install a new wall fan |
FAL, School of Social Sciences | Install 1 glass & 1 plain notice board, install knobs on pigeon holes, repair pigeon hole key slot, install 4 small plain pin up boards |
SCIMS,A102 | Change white board |
9th Hall | Carpentry and painting works for exterior |
April | Lower Campus, SIO, Wooden Computer Lab | Install new power point |
6th Hall, MQ(Minor Works Tea Room) | Install new hot water Urn |
International Students Office | Install new hot water Urn |
MQ12 | Electrical works |
International Students Office | Install new wall fans |
MQ40 | Renovations & extension |
7th,8th,9th Hall | Carpentry & painting works |
7th Hall, A Block | Reroof building |
Southern Cross, Male & Female toilet | Modify Wall |
MQ12 | General plumbing work |
International Students Office | Install lights |
Dining Hall | Repair leaking roof, replace canvas on loading dock, remove freezer room from unloading dock |
Lower Campus, SIO, Wooden Computer Lab | Install new power point |
6th Hall, MQ(Minor Works Tea Room) | Install new hot water Urn |
International Students Office | Install new hot water Urn |
May | 7th & 8th Hall | Carpentry and painting works |
MQ40 | Repair/replace main line |
SCIMS/ICT | Dismantle all tables at SCIMS and assemble in ICT complex |
SCIMS/ICT | Remove white board/notice board from SCIMS and place in ICT |
MBA,Statham,B204 | Renovation works |
ICT, Room A11/A12/T4-4th floor/3rd Floor | Install curtain racks provided by SCIMS in rooms listed |
FAL, New staff lounge | Install new double power point above kitchen bench |
ICT Building | Put up pin boards and white boards in staff offices, dismantle/assemble tables, paint assignment boxes and box chairs |
FAL, Toilets | Renovation works |
June | Old SCIMS Building, CFS | Check electrical works |
FSTE | Construct solar panels |
Library, Admin Building End | Paint existing painted surface |
MQ40 | Clear/landscape area around MQ40 |
ITS, Communications Building | Renovate and convert ITS Lab to FSTE Computer Lab |
New CFS Building, Computer lab | Remove all electrical wires and lights and rewire and install after ceiling has been changed |
New CFS Building | Replace both toilet pan(s) in female toilet |
ITS Media Centre | Remove sink and water pipes |
SAS/Old ITS Building | Relocate SAS to Old ITS Building |
July | Old Media Centre(SAS) | Remove/replace sink in tea room |
Lecture Rooms(FAL/FBE/Old IJALS/CELT) | Construct partition in/to Lecture rooms |
New ICT Building | Construct stage and backdrops, put up regional flags |
Swimming Pool | Cut and rake grass around swimming pool area |
Fitness Centre/Verandah Bar | Cut and rake grass around Fitness Centre and Verandah Bar |
CELT Building, Old SAS | Remove sink |
Dining Hall, Staff Office | Renovate old staff office to Union office |
CELT Building, Room 103 | Construct and install more shelving in room |
Dining Hall | Carry out plumbing works at the Dining Hall |
Statham Campus, Building 203 & MBA Reception | MBA Reception - Check/repair loose power point, Building 203 - Install 4ft tube light in front of building |
Statham Campus, Building 201 | Install new tap with 3/4" fitting outside B201,Check/replace 2 taps with 3/4" fitting |
IPS | Carry out works at IPS |
Gym | Drill holes for pool table to fit tow bolts |
Fitness Centre | Check/repair leaking roof |
FAL, Room H104 | Fabricate and install folding doors(like in Room 026) |
Fitness Centre | Check/clear blocked toilet |
USP Union Office | Relocate light switch |
Old Media Centre(SAS) | Remove/replace sink in tea room |
Lecture Rooms(FAL/FBE/Old IJALS/CELT) | Construct partition in/to Lecture rooms |
August | Verandah Bar(CRC) | |
Check/repair faulty Urinal |
CFS Building/SOH Building | Install on notice board in CFS(brought from SOH),Relocate notice board from one corner of Admin Block to another |
Swimming Pool | Check/repair vacuum extension pole |
Old Communications Building, SAS | Terminate & remove some lights in new SAS Filling Room |
Swimming Pool | Cut and blow grass around Swimming Pool |
Fitness Centre, Ladies Washroom | Check/replace toilet seat |
MQ40 | Check/replace door lock |
IPS, Director's Office & Art Gallery | Carry out plumbing works at IPS |
Fitness Centre | Check/repair wall and ceiling fans |
JICA Office | Carry out interior and exterior works of Building |
Statham Campus, Building B204 | Renovate Building(roof painting/wall painting/tiling) |
September | CJP Workshop | Construct and install cupboard to house all Joinery machines |
Temporary Tent/Marquee for Open Day | Provide electrical outlets for SCIMS tent on open day(24th September) |
MQ40 | Tile steps and area beneath steps leading to Laundry room, repair windows and doors in Maid's quarters, install lock between Maid's quarters, install door knob in bathroom |
ICT Building B, Level 4 | Dismantle and remove table from room |
CJP Workshop | Construct and install cupboard to house all Joinery machines |
October | Sunderland & Catalina Drive Power House | Paint powerhouses along Sunderland and Catalina |
ICT Building | Dismantle tables on 4th floor ICT Building B & assemble in ICT Building A, Research Lab |
Foreshore Area(Family Fun Day) | Set up tents/marquees for Family Fun Day |
ICT Building A,4th Floor, Dr. Pramanik's Office | Make portable stand for a 4' x 4' whiteboard(board provided by SCIMS) |
Sunderland & Catalina Drive Power House | Paint powerhouses along Sunderland and Catalina |
November | Aus-aid lecture room | Put up tents for VC forum/put platform in Aus-aid, Set up flags, Ropes and stands |
MQ51B | Renovation Works |
Admin Building | Tint glass windows, install side louver with glass, check/repair glass window(side to car park),staff toilet lock |
MSP | Put up tent |
Hall, student laundry area | Carry out carpentry works |
December | MQ51B | Plumbing Work |
IPS, Music Studio | Renovation |
MQ54 | Check and construct fence |
FBE/ Toilets | General plumbing works |
FAL(post graduate) | Renovation |
FAL(post graduate) | Electrical Work |
MQ51B | Plumbing Work |
IPS, Music Studio | Renovation |