Estates & Infrastructure

Estates & Infrastructure



Maintenance Services

Maintenance Services

Maintenance Services

Something Not Working?

  • bulb not turning on. . .
  • door knob jammed. . .
  • louvre making creaking noises. . .
  • fan not working. . .

Repair & Corrective Maintenance Reporting, Please Click Here

  • All new work is at your own cost and you Dept. Vote Code is required for the works to start.
  • For urgent matters you can call the Helpdesk on 32440
  • For other Maintenance Requests Email: maintenance(at)usp.ac.fj

New Work?

  • new construction work. . .
  • reconfigure existing space. . .

Maintenance Services Offers:

 

The Maintenance Workshops are located at the Middle Campus (Properties & Facilities). Click to see the Maintenance Team Organization Structure

Deferred Maintenance

Deferred Maintenance Register

2016

Deferred Maintenance Program 2016

No.

Project Name

Ops Team/Contractor

Project Status

January - April

1.

FALE Complex: General Maintenance, Painting & Cyclone Upgrade.

Permal Construction Ltd

Completed

2.

Marine Studies Centre: Interior Painting, Marine Lab Flooring and maintenance works

Permal Construction Ltd

Completed

3.

New Security gate; South Gate entrance

Permal Construction Ltd

Completed

4.

Library Lights upgrade, replacement to LED lights

Ops Team 2

Completed

May - August

1.

IAS Microbiology Lab: General Maintenance, Painting & Cyclone upgrade works.

Permal Construction Ltd 

 Completed

2.

RST Building: General Maintenance, Painting & Cyclone upgrade works.

Permal Construction Ltd 

 Completed

3.

FBE Post Graduate Lab: Roof maintenance & Cyclone upgrade works

Nair Builders 

 Completed

4.

Library Complex: Electrical Distribution/Switch Board Upgrade works

 AJYNK Electrical

Completed

5.

Australia Pacific Lecture Theatre: Electrical Distribution/Switch Board Upgrade works

 AJYNK Electrical

 Completed

6.

AUSAID Tutorial Building: Electrical Distribution/Switch Board Upgrade works

 AJYNK Electrical

 Completed

7.

ITS Lab 7: Electrical Distribution/Switch Board Upgrade works

 AJYNK Electrical

Completed

8.

Oceania Centre Arts & Gallery: Electrical Distribution/Switch Board Upgrade works

 AJYNK Electrical

Completed

9.

Marine Studies Centre: Electrical Distribution/Switch Board Upgrade works

 AJYNK Electrical

Completed

10.

IAS Wooden Building: Electrical Distribution/Switch Board Upgrade works

 AJYNK Electrical

Completed

11.

School of Geography, Earth Science & Environmental Building: Electrical Distribution/Switch Board Upgrade works

 AJYNK Electrical

Completed

12.

Marine Workshop/Jetty Building: Electrical Distribution/Switch Board Upgrade works

 AJYNK Electrical

Completed

13.

PACE Academic Building: Electrical Distribution/Switch Board Upgrade works

 AJYNK Electrical

 Completed

14.

School of Land Management: Electrical Distribution/Switch Board Upgrade works

 AJYNK Electrical

Completed

15.

Engineering Wooden Building: Electrical Distribution/Switch Board Upgrade works

 AJYNK Electrical

Completed

September - December

16.

FSTE Complex Roof Maintenance & Cyclone Upgrade Works

 Fortech Construction

 Awarded/Project Plan Semester Break 2017

17.

FBE School of Accounting & Finance Office: General Maintenance, Painting & Cyclone upgrade works.

 Vinod Patel Works

  Completed

18.

Edu-care Centre/Kinder garden: General Maintenance, Painting & Cyclone upgrade works.

 Vinod Patel Works

 In Progress

19.

Records office: General Maintenance, Painting & Cyclone upgrade works.

 Vinod Patel Works

  In Progress

20.

Library Complex: Exterior Painting & Maintenance works.

 Permal Construction

  In Progress

21.

Engineering/Technology Building: Electrical Distribution/Switch Board Upgrade works

 Vinod Patel Works

 Completed

Maintenance Plans

Maintenance Plans Register

2016

Preventative/Cyclic Maintenance Plans 2016

No.

Project Name

Ops Team / Contractor

Project Status

January - April

1.

Semester 1 -  Preparatory works: Cleanup, water blasting etc.

Team 4

Completed

2.

Library; Entrance Staircase tiling & hand rail painting

Modern Investment Limited

Completed

3.

Pump Station CELT

Ops Team 1

Completed

4.

FSTE Handrail & Balustrade Painting

Core Builders

Completed

5.

Pump Station Dinning Hall

Ops Team 1

Completed

6.

FSTE Lab Roof Maintenance & Painting

City Maintenance & Plumbing

Completed

7.

Painting of ITS Helpdesk Booth Behind SOSS

Ops Team 1

Completed

8.

Pump Station DMCA

Ops Team 2

Completed

9.

Preventative Maintenance Teaching and Learning Space

Ops Team 1

Completed

10.

Pump Station Marine

Ops Team 1

Completed

11.

Pump Station 4th/5th Hall

Ops Team 2

Completed

12.

MSP Seafood Bure

Ops Team 2

Completed

13.

Pump Station SLMD

Ops Team 1

Completed

14.

Pump Station 6th/7th Hall

Ops Team 2

Completed

15.

Pump Station Behind USP Bookshop

Ops Team 1

Completed

16.

Pump Station Library

Ops Team 2

Completed

17.

Generator Shed Library

Ops Team 2

Completed

18.

Statham Campus: walkway maintenance & repair

Permal Construction Ltd

Completed

May August

19.

P&F Mechanical Workshop

Team 2

In Progress: Pending Engineers Inspection

20.

Light replacement to LED: ICT Teaching Lab space

Team 1

 Completed

21.

Counselling & Disability Centre Building

Team 2

 In Progress

22.

Preventative Maintenance Teaching and Learning Space

Team 1

 Completed

23.

Semester 2 - Preparatory works: Cleanup, water blasting etc.

Team 4

 Completed 

24.

Australia Pacific Lecture Theatre Floor Maintenance works.

Team 1

 Completed

25.

MSP Lecture theatre  Interior Painting & Maintenance Work

Team 1

 Completed

26.

CRC to Multipurpose Court Drainage repair works

Team 4

 Completed

27.

Perimeter Fence Repair works Ratu Sukuna Road

Team 4

 Completed

28.

Perimeter Fence repair works Statham Campus

Team 4

 Completed

29.

Tree trimming, campus wide

Team 4

Completed

30.

FSTE Roof repair  works

Team 3

Completed  

32.

Road Repair & line Marking

Team 4

Completed

33.

Pump Station - Vaturara

Team 1

Completed

34.

Pump Station - 2nd Hall

Team 2

Completed

September - December

35.

Pump Station Catalina Drive

Team 1

Completed

36.

Pump Station Namaste Lane

Team 2

Completed

37.

Pump Station 1st Hall

Team 2

Completed

38.

Pump Station MQ27

Team 1

Completed

39.

Pump Station MQ6

Team 2

Completed

40.

Ocean Centre: Visual Arts & Performance Space

Team 2

 In Progress: Pending Engineers inspection

41.

Preventative Maintenance Teaching and Learning space

Team 1

 Completed

42.

Science/Engineering (MM) Lab Maintenance works

Team 1

 Completed

43.

Study Bures -  (Opposite CRC); Interior Painting & Maintenance work

Team 2

 Completed

44.

Medical Centre Building

Team 2

In Progress: Pending Engineers  Final Inspection

2015

Operational Capital Projects

Operational Capital Projects 2016

No.

Project Name

Ops Team/outsourced

Project Status

January - April

1.

8th Hall Tank Basement

Modern Investment Limited

Completed

2.

11th Hall Culvert laying & Backfilling works

Multi-Works Ltd / Core Technologies Ltd

Completed

3.

Road Repair Works: Catalina Drive

Road Sealing Services Ltd

Completed

4.

Road Repair works: Behind Bookshop & FALE Car park

Road Sealing Services Ltd

Completed

May August

5..

Road Repair works: Drew street

Road Sealing Services Ltd

Completed

2.

Road Repair works: Moana Place (HR Car park)

Road Sealing Services Ltd

Completed

3.

Road Repair works: Dinning Hall

Road Sealing Services Ltd

Completed

4.

Road Repair works: Kia Orana Place

Road Sealing Services Ltd

Completed

5.

Road Repair works: 8th Hall Car park

Road Sealing Services Ltd

Completed

6.

Road Repair works: P&F Maintenance Yard

Road Sealing Services Ltd

Completed

7.

Road Repair works: Marine Lower Campus

Road Sealing Services Ltd

Completed

8.

Road Repair works: Statham Campus

Road Sealing Services Ltd

Completed

9.

Building repair works damaged during TC Winston

Cope Construction Ltd

Completed

September - December

 10.

Storm Water Drainage Improvement Works - Marine Campus 

 MultiWorks

Completed

11.

Road Upgrade Works: Engineering/Technology Dept.

 Road Sealing Services Ltd

Completed

12.

Road Upgrade Works: Sunderland Drive

 Road Sealing Services Ltd

Completed

13.

Road Upgrade Works: Oceania Centre

 Road Sealing Services Ltd

Completed

14.

Pony Club Ground Levelling

 Sen Excavations Works

Completed

15.

New Beach Volleyball Court: Maile Park

 Core Builders Ltd

Completed

Org Structure

Maintenance Team Organisation Structure

Click on the Organization Structure to see a further breakdown of the Maintenance Organization Structure

Disclaimer & Copyright l Contact Us l 
© Copyright 2004 - 2017. All Rights Reserved.
Page updated: Tuesday, November 07, 2017
The University of the South Pacific
Laucala Campus, Suva, Fiji
Tel: +679 323 1000