 |
|
 |
Our Team
Occupational Health & Safety
The OHS department is responsible for: - Hazard and Risk Management - Audits ,Inspections, Fact Sheets and Advisory
- OHS Training , Awareness & Procedures - Hazards, OHS Legislation, Personal Protective Equipment
- Emergency Preparedness – Procedures, Drills and Exercises ( Fire,Earthquake,Tsunami,Cyclone)
- Building Safety Training – Fire Safety, Fire Warden Training, Evacuation Plans and Procedures
- Occupational Hygiene and Environmental Monitoring –Heat,Humidity,Confined Spaces
- Injury Investigation and Prevention
- Safety Signage’s
Contact: Mr. Roman Chute
Operations/Projects
This team is responsible for managing the maintenance operations of the Property and Facilities Section and facilitating the physical works on the repair and maintenance requirements of the Laucala Campus, in collaboration with the Director Property and Facilities, Asset Manager and Manager Engineering Services.
In carry out its role diligently, the team under the leadership of the Manager Operations are grouped into seven teams which are: - CAD
- Projects
- Joiners
- Painters
- Waste Care
- Carpenters
- Landscape
Contact: Mr.Viliame Kasanawaqa
Engineering Services
The Engineering Services team is responsible for the maintenance of: - Electrical services – Lighting and power system (inclusive of street lights, electrical switch boards, etc.)
- Hydraulics services – plumbing and sanitary waste (inclusive of potable and waste water pumps)
- Fire Protection services – Fire alarm system and fire equipment (fire extinguishers, fire hose reels, fire hydrants, etc.)
- Mechanical services – air conditioning, fresh air and exhaust systems
- Stand-by diesel generators
- Lift services
- Security services - Access control and CCTV
Contact: Mr. Richard Sekiguchi for overall Engineering Services
In carrying out its role diligently, the team under the leadership of the Engineering Services Manager is grouped into three sub teams (in-house) which are the Electrical, Plumbing and Mechanical Teams. The Electrical team consists of 5 electricians and its team leader.
- Josevata Tabaka (Team Leader)
- Nilesh Navneet Chand
- Saanga Vanguna
- Sanjay Prasad
- Epeli Waqanisau
Contact: Mr. Josevata Tabaka
The Plumbing team consists of 5 plumbers and its team leader. - Sachida Nand (Team Leader)
- Samu Dokonivalu
- Anil Chandra
- Avinesh Pillay
- Joe Ravula
Contact: Mr. Sachida Nand
The Mechanical team consists of 1 mechanic and its team leader. - Luisa Antonio (Team Leader)
- Ganeshwar Prasad
Contact: Ms. Luisa Antonio
Asset Management & Finance
The Asset Management team is responsible for: - Facilitating maintenance job requests, transport & room booking and events set up
- Asset maintenance plan
- Documenting of all assets data electronically
- Space utilisation audits
- Financial operations
- Stock management
In carrying out its role diligently, the team under the leadership of the Projects Manager is grouped into two sub teams which are the Finance and AM Support. The Finance team consists of:
Contact: Ms. Monisha Singh
The AM Support team is made up of:
Contact: Mr. Mervyn Lepper
Organisation Structure
|
 |